Emergency Procedure Plan

This Prepare an Emergency Procedure Plan includes the inspection of the property, the design and plan of the emergency procedures for the specific property/buildings. The procedures will conform to the requirements of AS3745.

Under State OH&S regulations and AS3745, AS4083, AS1851 all workplaces are required to have written emergency procedures suitable for their site. The Wormald Consultant will come to the client’s site and develop an emergency procedures plan which is specific for the client’s needs.

This service includes the inspection of the property, the design and plan of the emergency procedures for the specific property/buildings. The procedures will conform to the requirements of AS3745 – 2002. A manual including CAD diagrams of the assembly areas and floor plans will be provided to the client and the nominated Wardens.

Duration: Preparation time for the procedures is 4- 6 weeks.
 

Portable Fire Equipment Enquiry

Please fill in the below to have one of our Wormald representatives contact you about your enquiry.

Please enter the word you see in the image below: